SKN Predictive Maintenance
Back to Fleet Overview

Device Asset

PSU-A-002

Power Supply · MKS ENI RPG-50 Singapore Branch — Line 1Runtime: 12,253 h
Warning

Last refresh:

30-Day Forward Prediction

Real-time inference overlaid with the model prediction issued 30 days ago for this window.

Current Cycle — Live
Model confidence: Medium
Today+15 days+30 days
Predicted failure window: Day 1013

Live Sensor Readings

Bearing Temperature

82.7°C

Motor Temperature

67.6°C

Fluid Temperature

44.4°C

Voltage

396V

Current Draw

12.6A

Vibration

4.4mm/s

Inlet Pressure

-0.84bar

Flow Rate

146L/min

Maintenance History

Open log →
  • 10/18/1969

    Servicing

    Restart after fab-wide power cycle. Telemetry nominal.