SKN Predictive Maintenance
Back to Fleet Overview

Device Asset

PSU-A-004

Power Supply · Advanced Energy Pinnacle+ Fab 2 — Line 3Runtime: 6,346 h
Degrading

Last refresh:

30-Day Forward Prediction

Real-time inference overlaid with the model prediction issued 30 days ago for this window.

Current Cycle — Live
Model confidence: Medium
Today+15 days+30 days
Predicted failure window: Day 2427

Live Sensor Readings

Bearing Temperature

74.3°C

Motor Temperature

69°C

Fluid Temperature

42.9°C

Voltage

398V

Current Draw

11.4A

Vibration

3.07mm/s

Inlet Pressure

-0.87bar

Flow Rate

139L/min

Maintenance History

Open log →
  • 11/2/1969

    Inspection

    Routine servicing; topped up cooling fluid.