SKN Predictive Maintenance
Back to Fleet Overview

Device Asset

PSU-A-006

Power Supply · Comet CPS-3000 Singapore Branch — Line 1Runtime: 18,439 h
Warning

Last refresh:

30-Day Forward Prediction

Real-time inference overlaid with the model prediction issued 30 days ago for this window.

Current Cycle — Live
Model confidence: Medium
Today+15 days+30 days
Predicted failure window: Day 1215

Live Sensor Readings

Bearing Temperature

81.9°C

Motor Temperature

72.3°C

Fluid Temperature

45.4°C

Voltage

397V

Current Draw

13.5A

Vibration

4.53mm/s

Inlet Pressure

-0.85bar

Flow Rate

139L/min

Maintenance History

Open log →
  • 11/17/1969

    Restart

    Routine servicing; topped up cooling fluid.