SKN Predictive Maintenance
Back to Fleet Overview

Device Asset

PSU-A-010

Power Supply · Advanced Energy Pinnacle+ Singapore Branch — Line 1Runtime: 6,624 h
Degrading

Last refresh:

30-Day Forward Prediction

Real-time inference overlaid with the model prediction issued 30 days ago for this window.

Current Cycle — Live
Model confidence: High
Today+15 days+30 days
Predicted failure window: Day 2730

Live Sensor Readings

Bearing Temperature

76°C

Motor Temperature

67°C

Fluid Temperature

44.4°C

Voltage

399V

Current Draw

11.8A

Vibration

2.96mm/s

Inlet Pressure

-0.87bar

Flow Rate

146L/min

Maintenance History

Open log →
  • 12/31/1969

    Servicing

    Bearing pack swap; runtime counter reset.